Welcome to the introduction to TVD course. In this course we will cover the basics of what is TVD, why you should use TVD, and how to do it.
What you'll get:
- TVD Definitions
- 11 Core Components of TVD
- Lean methods that support TVD in Design
- Lean methods that support TVD in Construction
- Why TVD works
- Mistakes that other people have made with TVD
Instructor:

Doanh Do
Doanh specializes in Lean Construction with an emphasize on Target Value Delivery (TVD), Integrated Project Delivery (IPD), Choosing By Advantages (CBA), and the Last Planner System (LPS). He helps capital projects (100M to +1B) improve decision-making, productivity, cost, and schedule by 20% to 45% through Lean Construction methods and technology. He has worked with and studied under the founders of Lean Construction in order to develop a holistic understanding of LC methods from both a practical and fundamental theoretical perspective. He is an editor of the Lean Construction Blog, a leading online resource for Lean Construction. The LCB has over 300 articles on LC, over 150,000 unique visitors each year, and over 1M page views. The Lean Construction Blog's mission is to democratize and advance Lean Construction around the world.